The main trench is a brick built bypass channel running parallel to the river to allow it to flow when locks were in use and to provide a water supply for the various processes used in making fertilizer. There are 3 tunnels along the channel, a human skull bone was found in the downstream tunnel end in 2015 and the tunnel exit was discovered and restored in 2016. Trench walls were rebuilt in November 2017.